Stop running your sites on WhatsApp and Excel.

Plan the work, track progress, mark attendance, order material and send the DPR from site, on the phone your supervisor already carries. Your office sees every project live, and bills go out from the same records.

Construction project management for Indian builders: daily reports with photos, the programme, labour, material, snags and approvals for every site, on one screen. Contractor bills and budgets are in there too.

  • Same dayProgress, photos and attendance from every site reach the office
  • 1 screenEvery project’s progress, delays and open issues
  • ₹0 per userYour whole team, site to office, on every plan
  • 30 days freeEvery feature, no card, nothing charged after
  • Works on any phone at site
  • Your Excel data moved in for you
  • Tally export included
The Mezura OS dashboard: active and at-risk projects, pending invoices, outstanding dues, budget utilisation, and budget against actual spend for each project.
Contractor RA bills on a tablet: each bill with its project, this period’s value, net payable and status.
Client billing on a tablet: each invoice to the client with the amount, retention held, money received and status.
The owner’s phone: daily reports from every project, with entries, workers logged and the latest reports by site.
The muster roll on a phone: each worker with Present, Half day and Absent buttons.

Works with the tools your office already uses

  • TallyPrime & Tally.ERP 9Bills and payments export as vouchers
  • Microsoft ExcelImport BOQs, workers, vendors and programmes
  • WhatsAppApproval and bill alerts, for people who opt in
  • Open APIConnect your own systems, on the Max plan

Product tour

Everything that happened on site, on one screen

The daily report your office opens each evening. Point atTap a number to see what it does.

Daily Report / Sai Residency, Wing B

18 Oct 2026 — Daily Site Record

Sunny · 32°C
Awaiting sign-off On site · 40 m · 18 Oct, 6:42 pm PDFShare Send backSign off

Crew on site

46

Photos

12

Contractors

3

Programme progress

  • Slab casting, 5th floor38 m³
  • Blockwork, 3rd floor120 m²
  • Conduiting, 4th floor65%

Delays · 2 h lost

  • Material shortage2 h

Materials received

  • Cement OPC 53200 bags
  • TMT bar 12 mm4.2 t

Work progress summary

5th floor slab cast, 38 m³ M25 by pump, finished 5:30 pm. Blockwork on the 3rd floor carried on after cement arrived at noon. Curing starts tomorrow.

Labour report

ContractorWorkersRemarks
Shree Ganesh Labour24Shuttering and casting, 5th floor
Patil Masonry14Blockwork, 3rd floor
R.K. Electricals8Conduiting, 4th floor
  1. The phone records where and when the report was made. One sent from far away is flagged, not hidden.

  2. Download the day as a PDF, or share it on WhatsApp. Only managers and admins can share it outside the company.

  3. The project manager signs it off, or sends it back with what needs changing. Nobody signs off their own report.

  4. Crew on site, photos taken and contractors working, read before the first call of the morning.

  5. Quantity done against a programme activity updates the schedule. With the crew count, it gives you output per worker.

  6. Rain, a material shortage, a late drawing: each delay is logged with the hours lost and the activity it held up.

  7. Pick the GRN, and the materials and accepted quantities come from it. Nothing typed twice.

  8. The supervisor writes the day, in Hindi or Marathi if they like, and attaches photos. No signal? It waits on the phone and sends once.

  9. Each contractor's headcount and remarks, so a labour bill can be checked against the days.

The real DPR screen, redrawn so you can point at it. Sample project, illustrative figures.

How we work

We set it up with you, on a real project

You don't start from an empty screen. We bring your data in, run your first live project alongside you, and train the people who will use it.

SETUP FREE ✦ ON YEARLY PLANS ✦ ₹0 SETUP
  1. 01

    We bring your sheets in

    Send us your BOQs, workers, subcontractors and vendors in Excel. We import them, checked row by row before anything is saved.

  2. 02

    We run one project with you

    One live project through a full billing cycle: DPRs, attendance, measurements and the month's bills, with us there when a question comes up.

  3. 03

    We train office and site

    Your office and site teams, each on their own screens. Site staff get short forms with big buttons, in Hindi or Marathi if they prefer.

After that, a person answers. Email or WhatsApp, within one working day, Monday to Saturday, 10:00 to 19:00 IST.

FAQ

Questions, answered

Anything else, ask us on a call.

How much does Mezura OS cost?

You pay for the projects running at once, and every user is included on every plan. Every plan starts with 30 days free, no card. The plans and prices are on the pricing page.

Is our data safe?

Site staff record quantities and attendance without seeing a rupee, and Managers see only their projects. Every change is logged, the database is backed up nightly, and our support team can't read your data unless your Admin opens a time-limited, read-only window. More on the security page.

How do we get help?

Email info@mezuraos.in, and a person replies within one working day, Monday to Saturday, 10:00 to 19:00 IST. Step-by-step guides are in the help centre, and we move your existing Excel data in with you at the start.

Does Mezura OS replace Tally?

No. Your ledgers, GST returns and books stay in Tally. Mezura OS keeps the project side, measurements, RA bills, labour bills and payments, and exports your client bills, contractor bills and payments to Tally as vouchers for your accountant.

Do we need to install anything?

No. Mezura OS runs in the browser on phones, tablets and computers, so site teams use the phone they already have.

Get this month's RA bill out on time.Know where every project stands, today.

Start free for 30 days, or book a walkthrough at a time that suits you.

Rather watch first?

Built by Mohd Zafar Kadri, who spent nearly three years running project execution at a Mumbai construction firm.

Rather watch first?

2-minute walkthrough

Watch a quantity become a bill, start to finish

A BOQ line measured on site, turned into an RA bill with GST, retention and TDS, and the margin it leaves, in the real app. It plays here, and we email you the link.